1 |
Public Works |
PW-$8,225 |
Southwest Corner of Sixth St & McKinley Ave (next to Ft. Lupton Industrial Center). |
Due to 12” pipe and topography, ponding occurs during heavy rains. Solutions include, new inlets. New 30” (1,500 feet) piping is cost prohibitive at this time. |
|
|
|||
2 |
Public Works |
PW-$46,893 |
Sixth Street & Grand Ave. |
Ponding occurs because outlet pipe at Hwy 85 is blocked by significant ditch runoff. Solutions include redesign of outlet area, additional piping or changes downstream of ditch system. |
|
|
|||
3 |
Engineer, Bid, Contractor |
PW-$21,825 |
Southwest Corner of South Grand Avenue & Kahill Pl. |
Two issues here. Ponding at corner & runoff on driveway of private property. Solutions include new inlets and new piping. |
|
||||
4 |
Engineer, Bid, Contractor |
PW-$26,779 |
Salud Health Center (Second St between Harrison Ave & Rollie Ave. |
Ponding occurs in drainage area by sidewalk. Solutions include new storm pipe to the east. Note: Salud may partially fund. |
|||||
5 |
Engineer, Bid, Contractor |
PW-$27,500 |
Trapper Drive Storm Drain |
Remove and replace flowplan, inlets and manholes. |
|||||
6 |
Minimal Engineering, Bid, Contractor |
PW-$58,085 |
125 South Grand Ave. |
Piping insufficient, ponding on road & property. Solutions include installing new parallel drainage pipe. |
|
|
|
||
7 |
Public Works |
PW-$10,640 |
Vincent Park (Ninth St & west of Harrison Ave). |
Drainage pipe either clogs up or it is too small. Solutions include changing inlet pipe or just keeping it clean. |
|
|
|||
8 |
Engineer, Bid, Contractor |
PW-$66,760 |
In front of 1100 Denver Avenue or Crown Metal Products. |
Due to runoff, water flows into the business portion of the property. Solutions include curb/gutter/panning to a new inlet and new pipe connected to an existing drainage pipe. |
|||||
9 |
Public Works |
PW-$15,390 |
Big Drainage Pond (South Grand Ave & Lonepine St) |
Outlets in pond get clogged up. This possibly creates backup upstream in the system. Solutions include changing inlets and vegetation maintenance downstream. |
|
|
|||
10 |
Public Works |
PW-No Action |
Seventh St (between Broadway Ave & Grand Ave). |
Due to high street runoff, water flows onto private property & a garden. Solutions include berming, retaining walls, new inlets, etc. Problem may be solved by Projects 1 &2. |
|
|
|