1
To be done in
2008

Public Works

PW-$8,225
CW-$5,000

Southwest Corner of Sixth St & McKinley Ave (next to Ft. Lupton Industrial Center).

Due to 12” pipe and topography, ponding occurs during heavy rains. Solutions include, new inlets. New 30” (1,500 feet) piping is cost prohibitive at this time.

1

2

3

 

 

2
To be done in
2008

Public Works

PW-$46,893
CW-$35,000

Sixth Street & Grand Ave.

Ponding occurs because outlet pipe at Hwy 85 is blocked by significant ditch runoff. Solutions include redesign of outlet area, additional piping or changes downstream of ditch system.

4

5

6

 

 

3
To be done in 2009

Engineer, Bid, Contractor

PW-$21,825
CW-$35,000

Southwest Corner of South Grand Avenue & Kahill Pl.

Two issues here. Ponding at corner & runoff on driveway of private property. Solutions include new inlets and new piping.

7

8

10

11

 

4
To be done in 2009

Engineer, Bid, Contractor

PW-$26,779
CW-$30,000

Salud Health Center (Second St between Harrison Ave & Rollie Ave.

Ponding occurs in drainage area by sidewalk. Solutions include new storm pipe to the east.

Note: Salud may partially fund.

12

13

14

15

16

5
To be done in 2009

Engineer, Bid, Contractor

PW-$27,500
CW-???

Trapper Drive Storm Drain

Remove and replace flowplan, inlets and manholes.

17

18

19

20

21

6
To be done in
2008

Minimal Engineering, Bid, Contractor

PW-$58,085
CW-$30,000

125 South Grand Ave.

Piping insufficient, ponding on road & property. Solutions include installing new parallel drainage pipe.

22

23

 

 

 

7
To be done in 2009

Public Works

PW-$10,640
CW-$5,000

Vincent Park (Ninth St & west of Harrison Ave).

Drainage pipe either clogs up or it is too small. Solutions include changing inlet pipe or just keeping it clean.

24

25

26

 

 

8
To be done in 2009

Engineer, Bid, Contractor

PW-$66,760
CW-No Action

In front of 1100 Denver Avenue or Crown Metal Products.

Due to runoff, water flows into the business portion of the property. Solutions include curb/gutter/panning to a new inlet and new pipe connected to an existing drainage pipe.

27

28

29

30

31

9
To be done in 2009

Public Works

PW-$15,390
CW-No Action

Big Drainage Pond (South Grand Ave & Lonepine St)

Outlets in pond get clogged up. This possibly creates backup upstream in the system. Solutions include changing inlets and vegetation maintenance downstream.

32

33

34

 

 

10
To be done in 2009, if needed

Public Works

PW-No Action
CW-$15,000

Seventh St (between Broadway Ave & Grand Ave).

Due to high street runoff, water flows onto private property & a garden. Solutions include berming, retaining walls, new inlets, etc. Problem may be solved by Projects 1 &2.

35

36